1. A project that is built significantly under budget is good and indicates a competent designer. True or false?
2. An estimate prepared by the design firm at the end of design development guarantees the project completion cost to the owner. True or false?
3. As a project moves on in time, the accuracy of an estimate improves and the cost and time to complete it lessen. True or false?
4. Cost data provided by national firms (such as R. S. Means) must be adjusted to the specific project location. True or false?
5. Quality construction is good, and every designer should specify the highest- quality project components. True or false?
6. Which of the following will not increase the cost of a project?
a. Increased square footage
b. increased inflation
c. Increased availability of labor
d. Increased demand (faster schedule) for the finished project
e. Increased quality expectations
7. As the square footage of a project increases, what happens to the cost per square foot?
a. It decreases at a decreasing rate.
b. It decreases at an increasing rate.
c. It increases at a decreasing rate.
d. It increases at an increasing rate.
e. It stays the same.
8. How long should an estimate for a $2,000,000 building project, prepared at the end of design development, take?
a. One day
b. One to two weeks
c. Two to three weeks
d. One month
e. Two to three months
9. When considering project quality, which of the following is true?
a. As quality expenditures increase, the cost of providing the quality increases at a decreasing rate.
b. As quality .expenditures increase, the value of the increased quality to the owner increases at a decreasing rate.
c. As quality expenditures increase, the cost of providing the quality decreases at an increasing rate.
d. As quality expenditures increase, the value of the quality to the owner increases at an increasing rate.
e. None of the above takes place.
10. Which of the following is not a reason for construction cost variation among
different geographic locations?
a. Local union bargaining agreements
b. Physical project size
c. Rail/roadway/harbor capability
d. Local construction activity