5, extrusion side-wall construction
Extrusion type concrete side-wall construction technology in Brazil is the concrete dam eta panel dam slope construction of new methods. This is because the technology can provide timely slope surface protection and upstream can obviously improve the compaction of cushion material quality characteristics and become the concrete face rockfill dam construction is a new technology. Currently has more than ten foreign popularization and application of the concrete face rockfill dam of this new technology. By virtue of rockfill dam project of domestic carried out for the object of the side-wall extrusion type, and technical research in secondary, banana, head of the shuibuya hydropower station, etc. Our bid Malaysia and gong and Sue Danish los dimension engineering are also used.
In every side-wall construction method of filling a layer of cushion material, using spiral sidewall crushing mechanism, make a similar trapezoid half permeable concrete wall, and then in the small shop fill dam design inside, use of vibration grinding surface rolling, repeat above work after.
5.1 extrusion machinery
Sidewall crushing machine work by the shaanxi bureau group company, design and manufacture of highway engineering is the way for the principle, it includes four parts: the power system (diesel engines as dynamic systems with extrusion manner, driving equipment system (forward extrusion process, control the direction of walking), concrete extrusion storehouse (concrete discharge into hopper mixing concrete, through the propeller extrusion, through to the template in the mechanical vibration system installation to ensure sufficient vibration, the consistency of concrete construction quality), and in accordance with the extrusion machine template (side-wall wall design of fixed size template).
Section 5.2 extrusion wall design
Section of the side-wall, on the basic for trapezoid hinged connection can be considered. This can make the sidewall of settlement to cushion, easy forms cavity and adverse effects on panel. According to the upstream dam slope due to excessive than adjustment, shows the with a wide brim will reduce the deformation of the side-wall adaptive capacity, so should be limited in the top 12 cm width within. By 40 cm high walls, and after rolling of cushion material thickness according to the panel, upstream dam slope gradient, medial slope design for more than 1 to cushion material, about 70 thickness of bottom, each holding cm volume was 0.18 m3.
5.3 concrete mixture
Side-wall concrete performance should have low intensity, low elastic modulus, and semi-permeable characteristics, in order to meet with the cushion material filling up the concrete requirements, synchronization and high strength. Because of the extruder concrete mixture is sensitive, wet concrete travel faster, dry concrete speed slow, according to the level of concrete wall matchs extrusion, rolling cement mixture ratio design for 0 slump, usually using cement and 70 ~ 85 ㎏ / m3, water ㎏ / m3, 100 1.31 water-cement ratio, SuNingJi 1.45. - 28d concrete compressive strength of concrete 5Mpa about, the permeability coefficient in 10-2-10-3 cm/s, within the scope of elastic modulus of low requirements. By mixing concrete mixing plant, construction site to the truck.
第2个回答 2010-06-06
5th, extrusion frontier wall construction
The extrusion type concretes frontier wall construction technique is the concretes kneading board dam upstream slope construction new method which the dam project founds in Brazilian Aita. Because this kind of technology its can easily promptly provide the upstream slope the protection, and may enhance breaker strip material characteristics and so on compaction quality to become the kneading board dam construction obviously one kind of new technology. At present overseas had ten kneading board dam promotion to apply this new technology. The home has carried out the extrusion type frontier wall engineering research take the Gongboxia kneading board rock-fill dam project as the object, and plans in dragon second-level, power plant applications and so on Japanese banana mouth, Shuibuya. Our bureau is selected the Malaysian Pakistan tribute and the Sudanese Mai Luowei project also prepares to use.
The frontier wall technology is before each reclamation breaker strip material, makes one with the screw type frontier wall extrusion mechanism to be approximate in the trapezoid half water percolation concretes small wall, then fills in the dam material in its inside according to the design shop, flattens with a roller the surface roller compaction with the vibration, after qualified, above is redundant works.
5.1 extrude the machinery
The frontier wall extruder designs the manufacture by the Shanxi construction bureau Group, is profits from highway engineering along machine the principle manufacture becomes, it contains 4 parts: The dynamic system (the diesel engine takes the dynamic system with the extrusion way actuation equipment vanguard, the steering system (in extruder advance process, after control walks direction), the concretes to push the ballast (concretes unload into hopper, through propeller agitation concretes extrudes in template warehouse, inspires through installment machinery pounds system to inspire fully pounds, guarantees concretes dense and construction quality), side the wall telephone template (according to extrusion wall design size manufacture fixed stripper).
5.2 extrusion wall design cross section
The frontier wall section basic is a trapezoid, on the lower level connection may regard as the hinge way. This may cause the frontier wall adaptation breaker strip area the subsidence distortion, its lower part is not easy to form the cavity then counter plate to have the adverse effect. The upstream slope may act according to the dam slope slope compared to the adjustment, because oversized will go against the width to reduce ability which the frontier wall adaptation will distort, therefore the crown width should limit in 12㎝ within. The wall uses high 40㎝, is consistent after roller compaction breaker strip material thickness, the up stream slope determined according to the kneading board dam upstream slope, the inside slope is 8:1 take is advantageous for the breaker strip material roller compaction compared to the design, base thickness approximately as 70㎝, each linear meter Fang Liangwei 0.18m3.
5.3 proportionings of concrete
The frontier wall concretes performance should have the low intensity, the low ball mold, half water percolation characteristic, to satisfy with the breaker strip material reclamation synchronization rise request, the concretes must have the high early strength. Because the extruder is quite sensitive to the proportioning of concrete, the wet concretes approaching speed is quick, the dry concretes approaching speed is slow, therefore the extrusion wall concretes according to a gradation dry and hard proportioning of concrete design, the slump are 0, usually uses cement content 70~85㎏/m3, about water consumption 100㎏/m3, water ratio 1.31~1.45, flash-setting agent right amount. the 28d concretes compressive strength probably about 5Mpa, the concretes penetration coefficient in 10-2~10-3㎝/s the scope, requests the low ball mold. Uses mixes up Lou Banzhi, the concrete tank truck transportation to constructs the scene.本回答被网友采纳