求一篇土木工程英文文献翻译,毕业设计用的答:If needed, temporary flooring may be placed for use of personnel. As the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, ...